Trump signs executive order approving Keystone XL, Dakota Access pipelines.....(Video)

Search

New member
Joined
Nov 10, 2010
Messages
78,682
Tokens
Another Hollywood Cnut.






Shailene Woodley Vows to 'Mobilize' Protests After Trump Pushes Dakota Access Pipeline Forward


BY MIKE MILLERPOSTED ON JANUARY 24, 2017 AT 4:39PM EST


shailene-woodley5.jpg




Shailene Woodley isn’t giving up.
The Divergent actress pledged to continue her fight against the Dakota Access pipeline just hours after President Donald Trump signed an executive action to advance the controversial project on Tuesday.


Asked what her next move will be in protesting the pipeline, Woodley told MSNBC on Tuesday, “We mobilize.”


In September, Woodley joined the Standing Rock Sioux tribe and its allies on the ground in North Dakota to protest. Critics of the pipeline argue it would damage Native American cultural sites and could have disastrous environmental consequences. Woodley, who was arrested for protesting in Standing Rock in October, has also heavily criticized the use of force in removing peaceful protestors.


screen-shot-2016-10-10-at-3-32-21-pm.jpg

Shailene Woodley arrested in Standing Rock in October.FACEBOOK



“We saw people being shot with rubber bullets. I was arrested, hundreds were arrested. People being sprayed with water cannons in subzero degree temperatures trying to protect not only the earth, but indigenous sovereignty and indigenous rights,” she told MSNBC.

Woodley also reiterated comments she made over the weekend at the Sundance Film Festival, where she urged the festival’s chairman Robert Redford to cut ties with Sundance sponsor and pipeline funder Chase Bank.

“What we could do now as a population, as a society, is to hold our corporations accountable and hold our banks accountable, because there are a lot of banks that are invested in this pipeline,” she said. “Regardless of any executive order or what our politicians want to do, if there’s no money invested in the pipelines, then they can’t be built.”

In addition to violating native sovereignty, something she said “has been overlooked in our country for far too long,” Woodley believes the pipeline could be disastrous for the environment.



“This pipeline would be built underneath the Missouri river,” she explained. “As we know, it’s not a matter of if pipelines leak, it’s a matter of when pipelines leak. And when this one leaks, it would affect the drinking water of 18 million people, not only Standing Rock Sioux tribe in North Dakota [and] South Dakota, but millions of people down river as well.”


Woodley also addressed proponents of the pipeline who argue its construction would create thousands of jobs. “I agree that is time to bring more jobs to this country, but that’s why I think we need to start investing in renewable energy, because that is not a temporary job situation, that is something that would be permanent, and it’s something that would require actually implement energy independence in our country,” she said.

“There’s a lot of rhetoric and narratives out there that oil — in this country, these particular pipelines — are going to encourage energy
independence, but that’s not true,” she explained. “We know that this oil is going to be exported, so there’s lots of false narratives and a lot of lies, and if we’re talking about creating jobs, renewable energy is the way to go. It’s untapped territory and it would create millions of jobs.



 

New member
Joined
Nov 10, 2010
Messages
78,682
Tokens
More nutters awaken.




Josh Fox, the Oscar-nominated documentary filmmaker of Gasland, including the latest film in the series, How to Let Go of the World and Love All the Things Climate Can’t Change, weighed in today about the news that President Trump is issuing an executive order overturning the Obama administration’s decisions and advancing construction of the Dakota Access Pipeline and Keystone XL Pipeline. Fox will participate in a demonstration at Columbus Circle in Manhattan tonight starting at 6pm to protest the order.


“Trump is ignoring the millions of people who vehemently oppose these projects and he does so at peril of his own legitimacy,” said Fox. “Trump’s decree offends the rule of law. It violates tribal sovereignty, and upends the environmental review process. It flies in the face of our democratic process and contradicts the will of the American people, 80% of whom want renewable energy and 100% of whom want clean water. And it contradicts clear rulings from federal court upholding new environmental review for DAPL.”



“The water protectors and the pipeline protestors aren’t going to just accept Trump’s tyrannical order. We're non-violent, we're strong and we will fight it effectively,” said Fox, who spent several weeks at Standing Rock filming the violent crackdown on peaceful protesters. “We're a national movement now that Trump can’t stop with executive orders or militarized police crackdowns. This is the kind of hijacking of the public interest we can expect from Trump, but it won’t stand.”



In late 2016, thousands of protesters at Standing Rock succeeded in preventing the final leg of the Dakota Access Pipeline from crossing Standing Rock Sioux lands in North Dakota and threatening the water supply by tunneling under Lake Oahe. After the Obama administration decided in December to block DAPL construction on the disputed land and restart environmental review, the protesters celebrated a victory, though they remained vigilant.



Trump’s executive order is expected to rescind the new Environmental Impact Statement process that would study new routes for the Dakota Access Pipeline. That process was upheld in Federal District Court last week after a challenge from DAPL lawyers. Donald Trump has been a stockholder in Energy Transfer Partners, the company building the Dakota Access Pipeline.


Jan Hasselman, an attorney for the Standing Rock Sioux tribe, predicted a Trump executive order overturning DAPL may not stand up in court, noting that President George W. Bush's attempts to roll back Clinton-era environmental policy measures were repeatedly challenged in federal court.


Meanwhile, in the wake of Standing Rock, protests against pipelines and other fossil fuel infrastructure have sprung up nationwide, including the Bayou Bridge Pipeline in Louisiana, the Trans-Pecos Pipeline in West Texas, the Diamond Pipeline in Memphis, and the Sabal Trail Pipeline in Florida, to name a few.

Stephen Kent is the president of KentCom LLC, a public interest and public policy PR practice.
 

New member
Joined
Nov 10, 2010
Messages
78,682
Tokens
The Trump Train@The_Trump_Train 8h8 hours agoMore



Democrats fail to recognize that providing affordable energy to Americans via pipelines is the blood of our economy. #MAGA

C2-SI6-XUAo1DS9.jpg




65 replies .602 retweets1,461 likes
Reply
65

Retweet
602



Like
1.5K


 

Active member
Handicapper
Joined
Jun 18, 2007
Messages
90,998
Tokens
When he signs Executive Orders.....It`s just putting scumbag Obama more and more in the rear view mirror.

I love these Executive Orders......The man is working.
 

New member
Joined
Nov 10, 2010
Messages
78,682
Tokens
[FONT=&quot]The White House
Office of the Press Secretary

For Immediate Release
January 24, 2017




[/FONT]

[h=1]Presidential Memorandum Regarding Construction of the Dakota Access Pipeline[/h]
[FONT=&quot]MEMORANDUM FOR THE SECRETARY OF THE ARMY
SUBJECT: Construction of the Dakota Access Pipeline
Section 1. Policy. The Dakota Access Pipeline (DAPL) under development by Dakota Access, LLC, represents a substantial, multi-billion-dollar private investment in our Nation's energy infrastructure. This approximately 1,100-mile pipeline is designed to carry approximately 500,000 barrels per day of crude oil from the Bakken and Three Forks oil production areas in North Dakota to oil markets in the United States. At this time, the DAPL is more than 90 percent complete across its entire route. Only a limited portion remains to be constructed.
I believe that construction and operation of lawfully permitted pipeline infrastructure serve the national interest.
Accordingly, pursuant to the authority vested in me as President by the Constitution and the laws of the United States of America, I hereby direct as follows:
Sec. 2. Directives. (a) Pipeline Approval Review. The Secretary of the Army shall instruct the Assistant Secretary of the Army for Civil Works and the U.S. Army Corps of Engineers (USACE), including the Commanding General and Chief of Engineers, to take all actions necessary and appropriate to:
(i) review and approve in an expedited manner, to the extent permitted by law and as warranted, and with such conditions as are necessary or appropriate, requests for approvals to construct and operate the DAPL, including easements or rights-of-way to cross Federal areas under section 28 of the Mineral Leasing Act, as amended, 30 U.S.C. 185; permits or approvals under section 404 of the Clean Water Act, 33 U.S.C. 1344; permits or approvals under section 14 of the Rivers and Harbors Act, 33 U.S.C. 408; and such other Federal approvals as may be necessary;
(ii) consider, to the extent permitted by law and as warranted, whether to rescind or modify the memorandum by the Assistant Secretary of the Army for Civil Works dated December 4, 2016 (Proposed Dakota Access Pipeline Crossing at Lake Oahe, North Dakota), and whether to withdraw the Notice of Intent to Prepare an Environmental Impact Statement in Connection with Dakota Access, LLC's Request for an Easement to Cross Lake Oahe, North Dakota, dated January 18, 2017, and published at 82 Fed. Reg. 5543;
(iii) consider, to the extent permitted by law and as warranted, prior reviews and determinations, including the Environmental Assessment issued in July of 2016 for the DAPL, as satisfying all applicable requirements of the National Environmental Policy Act, as amended, 42 U.S.C. 4321 et seq., and any other provision of law that requires executive agency consultation or review (including the consultation or review required under section 7(a) of the Endangered Species Act of 1973, 16 U.S.C. 1536(a));
(iv) review and grant, to the extent permitted by law and as warranted, requests for waivers of notice periods arising from or related to USACE real estate policies and regulations; and
(v) issue, to the extent permitted by law and as warranted, any approved easements or rights-of-way immediately after notice is provided to the Congress pursuant to section 28(w) of the Mineral Leasing Act, as amended, 30 U.S.C. 185(w).
(b) Publication. The Secretary of the Army shall promptly provide a copy of this memorandum to the Speaker of the House of Representatives, the President pro tempore of the Senate, the Majority Leader of the Senate, and the Governors of each State located along the Dakota Access Pipeline route. The Secretary of the Army is authorized and directed to publish this memorandum in the Federal Register.
(c) Private Property. Nothing in this memorandum alters any Federal, State, or local process or condition in effect on the date of this memorandum that is necessary to secure access from an owner of private property to construct the pipeline and facilities described herein. Land or an interest in land for the pipeline and facilities described herein may only be acquired consistently with the Constitution and applicable State laws.
Sec. 3. General Provisions. (a) Nothing in this memorandum shall be construed to impair or otherwise affect:
(i) the authority granted by law to an executive department or agency, or the head thereof; or
(ii) the functions of the Director of the Office of Management and Budget relating to budgetary, administrative, or legislative proposals.
(b) This memorandum shall be implemented consistent with applicable law and subject to the availability of appropriations.
(c) This memorandum is not intended to, and does not, create any right or benefit, substantive or procedural, enforceable at law or in equity by any party against the United States, its departments, agencies, or entities, its officers, employees, or agents, or any other person.

DONALD J. TRUMP​


[/FONT]
 

New member
Joined
Nov 10, 2010
Messages
78,682
Tokens
[FONT=&quot]The White House
Office of the Press Secretary

For Immediate Release
January 24, 2017




[/FONT]

[h=1]Presidential Memorandum Regarding Construction of the Keystone XL Pipeline[/h]
[FONT=&quot]MEMORANDUM FOR THE SECRETARY OF STATE
THE SECRETARY OF THE ARMY
THE SECRETARY OF THE INTERIOR
SUBJECT: Construction of the Keystone XL Pipeline
Section 1. Policy. In accordance with Executive Order 11423 of August 16, 1968, as amended, and Executive Order 13337 of April 30, 2004, the Secretary of State has delegated authority to receive applications for Presidential permits for the construction, connection, operation, or maintenance, at the borders of the United States, of facilities for the exportation or importation of petroleum, petroleum products, coal, or other fuels to or from a foreign country, and to issue or deny such Presidential permits. As set forth in those Executive Orders, the Secretary of State should issue a Presidential permit for any cross-border pipeline project that "would serve the national interest."
Accordingly, pursuant to the authority vested in me as President by the Constitution and the laws of the United States of America, I hereby direct as follows:
Sec. 2. Invitation to Submit an Application. I hereby invite TransCanada Keystone Pipeline, L.P. (TransCanada), to promptly re-submit its application to the Department of State for a Presidential permit for the construction and operation of the Keystone XL Pipeline, a major pipeline for the importation of petroleum from Canada to the United States.
Sec. 3. Directives. (a) Department of State. The Secretary of State shall, if the application referred to in section 2 is submitted, receive the application and take all actions necessary and appropriate to facilitate its expeditious review. With respect to that review, I hereby direct as follows:
(i) The Secretary of State shall reach a final permitting determination, including a final decision as to any conditions on issuance of the permit that are necessary or appropriate to serve the national interest, within 60 days of TransCanada's submission of the permit application.
(ii) To the maximum extent permitted by law, the Final Supplemental Environmental Impact Statement issued by the Department of State in January 2014 regarding the Keystone XL Pipeline (Final Supplemental EIS) and the environmental analysis, consultation, and review described in that document (including appendices) shall be considered by the Secretary of State to satisfy the following with respect to the Keystone XL Pipeline as described in TransCanada's permit application to the Department of State of May 4, 2012:
(A) all applicable requirements of the National Environmental Policy Act of 1969, 42 U.S.C. 4321 et seq.; and
(B) any other provision of law that requires executive department consultation or review (including the consultation or review required under section 7(a) of the Endangered Species Act of 1973, 16 U.S.C. 1536(a)).
(iii) To the maximum extent permitted by law, any Federal permit or authorization issued before the date of this memorandum for the Keystone XL Pipeline shall remain in effect until the completion of the project.
(iv) The agency notification and fifteen-day delay requirements of sections 1(g), 1(h), and 1(i) of Executive Order 13337 are hereby waived on the basis that, under the circumstances, observance of these requirements would be unnecessary, unwarranted, and a waste of resources.
(b) Department of the Army. The Secretary of the Army shall, if the application referred to in section 2 is submitted and a Presidential permit issued, instruct the Assistant Secretary of the Army for Civil Works and the U.S. Army Corps of Engineers, including the Commanding General and Chief of Engineers, to take all actions necessary and appropriate to review and approve as warranted, in an expedited manner, requests for authorization to utilize Nationwide Permit 12 under section 404(e) of the Clean Water Act, 33 U.S.C. 1344(e), with respect to crossings of the "waters of the United States" by the Keystone XL Pipeline, to the maximum extent permitted by law.
(c) Department of the Interior. The Secretary of the Interior, as well as the Directors of the Bureau of Land Management and the United States Fish and Wildlife Service, shall, if the application referred to in section 2 is submitted and a Presidential permit issued, take all steps necessary and appropriate to review and approve as warranted, in an expedited manner, requests for approvals related to the Keystone XL Pipeline, to the maximum extent permitted by law, including: (i) requests for grants of right-of-way and temporary use permits from the Bureau of Land Management; (ii) requests under the United States Fish and Wildlife Service's regulations implementing the Migratory Bird Treaty Act, 16 U.S.C. 703 et seq.; and (iii) requests for approvals or other relief related to other applicable laws and regulations.
(d) Publication. The Secretary of State shall promptly provide a copy of this memorandum to the Speaker of the House of Representatives, the President pro tempore of the Senate, the Majority Leader of the Senate, and the Governors of each State located along the Keystone XL Pipeline route as described in TransCanada's application of May 4, 2012. The Secretary of State is authorized and directed to publish this memorandum in the Federal Register.
(e) Private Property. Nothing in this memorandum alters any Federal, State, or local process or condition in effect on the date of this memorandum that is necessary to secure access from an owner of private property to construct the pipeline and cross-border facilities described herein. Land or an interest in land for the pipeline and cross-border facilities described herein may only be acquired consistently with the Constitution and applicable State laws.
Sec. 4. General Provisions. (a) Nothing in this memorandum shall be construed to impair or otherwise affect:
(i) the authority granted by law to an executive department or agency, or the head thereof; or
(ii) the functions of the Director of the Office of Management and Budget relating to budgetary, administrative, or legislative proposals.
(b) This memorandum shall be implemented consistent with applicable law and subject to the availability of appropriations.
(c) This memorandum is not intended to, and does not, create any right or benefit, substantive or procedural, enforceable at law or in equity by any party against the United States, its departments, agencies, or entities, its officers, employees, or agents, or any other person.

DONALD J. TRUMP​


[/FONT]
 

New member
Joined
Nov 10, 2010
Messages
78,682
Tokens
[FONT=&quot]The White House
Office of the Press Secretary

For Immediate Release
January 24, 2017




[/FONT]

[h=1]President Trump Takes Action to Expedite Priority Energy and Infrastructure Projects[/h]
[FONT=&quot]WASHINGTON, DC – President Donald J. Trump today signed a series of Executive Orders and Presidential Memoranda in keeping with his promise to reduce the burden of regulations and expedite high priority energy and infrastructure projects that will create jobs and increase national security.
Presidential Memorandum Regarding Construction of the Keystone XL Pipeline
With this Presidential Memorandum, President Trump will help fulfill the campaign promise of initiating the process for approving the Keystone XL Pipeline.
The Keystone XL Pipeline is an 1,100-mile crude oil pipeline to connect oil production in Alberta, Canada to refineries in the United States.
Construction and operation of the Keystone XL Pipeline, as well as oil production and refining activities related to it, would create tens of thousands of jobs for American workers, enhance our nation’s energy security, support affordable and reliable energy for American families, and generate significant State and local tax revenues that can be invested in schools, hospitals, and infrastructure.
Presidential Memorandum Regarding Construction of the Dakota Access Pipeline
With this Presidential Memorandum, President Trump directed the relevant Federal agencies (including the Army Corps of Engineers) to expedite reviews and approvals for the remaining portions of the Dakota Access Pipeline., a $3.8 billion, 1,100-mile pipeline designed to carry around 500,000 barrels per day of crude oil from the Bakken and Three Forks oil production areas in North Dakota to oil markets in the U.S.
At this time, DAPL is more than 90% complete across its entire route. Only a limited stretch of the project is not yet constructed. Timely review and approval of energy pipelines is critical to a strong economy, energy independence, and national security.
Presidential Memorandum Regarding Construction of American Pipelines
In keeping with his commitment to “Buy American, Hire American”, President Trump directed the Secretary of Commerce, in consultation with all relevant executive departments and agencies, to develop a plan under which all new pipelines, as well as retrofitted, repaired, or expanded pipelines, inside the borders of the United States, including portions of pipelines, use materials and equipment produced in the United States, to the maximum extent possible and to the extent permitted by law. The Secretary shall submit the plan to the President within 180 days of the date of this memorandum.
Presidential Memorandum Streamlining Permitting and Reducing Regulatory Burdens for Domestic Manufacturing
With this Presidential Memorandum, President Trump helps fulfill the campaign promise of boosting domestic manufacturing by determining a plan of action for expediting approvals for manufacturing and reducing regulatory burdens.
Under this Presidential Memorandum, the Secretary of Commerce will conduct outreach to stakeholders and solicit comments from the public concerning Federal actions to streamline permitting and reduce regulatory burdens affecting domestic manufacturers.
The Commerce Secretary will submit a report to the President identifying recommendations to streamline Federal permitting processes for domestic manufacturing and to reduce regulatory burdens affecting domestic manufacturers. The report should identify priority actions as well as recommended deadlines for completing actions.
Executive Order Expediting Environmental Reviews and Approvals For High Priority Infrastructure Projects
With this Executive Order, President Trump will establish a framework for expediting environmental reviews for high priority infrastructure projects.
Delays and other inefficiencies in the environmental review and permitting process are severely impeding critically important projects to rebuild and modernize our nation’s infrastructure, such as highways, bridges, tunnels, the electrical grid, ports, water systems, airports, railways and pipelines.
According to one study, our antiquated power rigs wastes the equivalent of 200 coal-fired power plants, water pipes leak trillions of gallons of water, and gridlock on roads and railroads wastes hundreds of billions annually.



[/FONT]
 

New member
Joined
Nov 10, 2010
Messages
78,682
Tokens
[FONT=&quot]The White House
Office of the Press Secretary

For Immediate Release
January 24, 2017




[/FONT]

[h=1]Presidential Memorandum Streamlining Permitting and Reducing Regulatory Burdens for Domestic Manufacturing[/h]
[FONT=&quot]
January 24, 2017​
MEMORANDUM FOR THE HEADS OF EXECUTIVE DEPARTMENTS AND AGENCIES
SUBJECT: Streamlining Permitting and Reducing Regulatory Burdens for Domestic Manufacturing
By the authority vested in me as President by the Constitution and the laws of the United States of America, I hereby direct the following:
Section 1. Purpose. This memorandum directs executive departments and agencies (agencies) to support the expansion of manufacturing in the United States through expedited reviews of and approvals for proposals to construct or expand manufacturing facilities and through reductions in regulatory burdens affecting domestic manufacturing.
Sec. 2. Stakeholder Consultation on Streamlining Permitting. The Secretary of Commerce shall conduct outreach to stakeholders concerning the impact of Federal regulations on domestic manufacturing and shall solicit comments from the public for a period not to exceed 60 days concerning Federal actions to streamline permitting and reduce regulatory burdens for domestic manufacturers. As part of this process, the Secretary of Commerce shall coordinate with the Secretaries of Agriculture and Energy, the Administrator of the Environmental Protection Agency, the Director of the Office of Management and Budget, the Administrator of the Small Business Administration, and such other agency heads as may be appropriate.
Sec. 3. Permit Streamlining Action Plan. Within 60 days after completion of the process described in section 2 of this memorandum, the Secretary of Commerce shall submit a report to the President setting forth a plan to streamline Federal permitting processes for domestic manufacturing and to reduce regulatory burdens affecting domestic manufacturers. The report should identify priority actions as well as recommended deadlines for completing actions. The report also may include recommendations for any necessary changes to existing regulations or statutes, as well as actions to change policies, practices, or procedures that can be taken immediately under existing authority.
Sec. 4. General Provisions. (a) Nothing in this memorandum shall be construed to impair or otherwise affect:
(i) the authority granted by law to an executive department or agency, or the head thereof; or
(ii) the functions of the Director of the Office of Management and Budget relating to budgetary, administrative, or legislative proposals.
(b) This memorandum shall be implemented consistent with applicable laws and subject to the availability of appropriations.
(c) This memorandum is not intended to, and does not, create any right or benefit, substantive or procedural, enforceable at law or in equity by any party against the United States, its departments, agencies, or entities, its officers, employees, or agents, or any other person.
(d) The Secretary of Commerce is hereby authorized and directed to publish this memorandum in the Federal Register.
DONALD J. TRUMP​


[/FONT]
 

New member
Joined
Nov 10, 2010
Messages
78,682
Tokens
[FONT=&quot]The White House
Office of the Press Secretary

For Immediate Release
January 24, 2017




[/FONT]

[h=1]Executive Order Expediting Environmental Reviews and Approvals For High Priority Infrastructure Projects[/h]
[FONT=&quot]
EXECUTIVE ORDER- - - - - - -EXPEDITING ENVIRONMENTAL REVIEWS AND APPROVALS
FOR HIGH PRIORITY INFRASTRUCTURE PROJECTS​
By the authority vested in me as President by the Constitution and the laws of the United States of America, I hereby direct as follows:
Section 1. Purpose. Infrastructure investment strengthens our economic platform, makes America more competitive, creates millions of jobs, increases wages for American workers, and reduces the costs of goods and services for American families and consumers. Too often, infrastructure projects in the United States have been routinely and excessively delayed by agency processes and procedures. These delays have increased project costs and blocked the American people from the full benefits of increased infrastructure investments, which are important to allowing Americans to compete and win on the world economic stage. Federal infrastructure decisions should be accomplished with maximum efficiency and effectiveness, while also respecting property rights and protecting public safety and the environment. To that end, it is the policy of the executive branch to streamline and expedite, in a manner consistent with law, environmental reviews and approvals for all infrastructure projects, especially projects that are a high priority for the Nation, such as improving the U.S. electric grid and telecommunications systems and repairing and upgrading critical port facilities, airports, pipelines, bridges, and highways.
Sec. 2. Identification of High Priority Infrastructure Projects. With respect to infrastructure projects for which Federal reviews and approvals are required, upon request by the Governor of a State, or the head of any executive department or agency (agency), or on his or her own initiative, the Chairman of the White House Council on Environmental Quality (CEQ) shall, within 30 days after a request is made, decide whether an infrastructure project qualifies as a "high priority" infrastructure project. This determination shall be made after consideration of the project's importance to the general welfare, value to the Nation, environmental benefits, and such other factors as the Chairman deems relevant.
Sec. 3. Deadlines. With respect to any project designated as a high priority under section 2 of this order, the Chairman of the CEQ shall coordinate with the head of the relevant agency to establish, in a manner consistent with law, expedited procedures and deadlines for completion of environmental reviews and approvals for such projects. All agencies shall give highest priority to completing such reviews and approvals by the established deadlines using all necessary and appropriate means. With respect to deadlines established consistent with this section that are not met, the head of the relevant agency shall provide a written explanation to the Chairman explaining the causes for the delay and providing concrete actions taken by the agency to complete such reviews and approvals as expeditiously as possible.
Sec. 4. General Provisions. (a) This order shall be implemented consistent with applicable law and subject to the availability of appropriations.
(b) Nothing in this order shall be construed to impair or otherwise affect:
(i) the authority granted by law to an executive department or agency or the head thereof; or
(ii) the functions of the Director of the Office of Management and Budget relating to budgetary, administrative, or legislative proposals.
(c) All actions taken pursuant to this order shall be consistent with requirements and authorities to protect intelligence and law enforcement sources and methods. Nothing in this order shall be interpreted to supersede measures established under authority of law to protect the security and integrity of specific activities and associations that are in direct support of intelligence and law enforcement operations.
(d) This order is not intended to, and does not, create any right or benefit, substantive or procedural, enforceable at law or in equity by any party against the United States, its departments, agencies, or entities, its officers, employees, or agents, or any other person.

DONALD J. TRUMP​
THE WHITE HOUSE,
January 24, 2017.



[/FONT]
 

New member
Joined
Nov 10, 2010
Messages
78,682
Tokens
[FONT=&quot]The White House
Office of the Press Secretary

For Immediate Release
January 24, 2017




[/FONT]

[h=1]Presidential Memorandum Regarding Construction of American Pipelines[/h]
[FONT=&quot]MEMORANDUM FOR THE SECRETARY OF COMMERCE
SUBJECT: Construction of American Pipelines
The Secretary of Commerce, in consultation with all relevant executive departments and agencies, shall develop a plan under which all new pipelines, as well as retrofitted, repaired, or expanded pipelines, inside the borders of the United States, including portions of pipelines, use materials and equipment produced in the United States, to the maximum extent possible and to the extent permitted by law. The Secretary shall submit the plan to the President within 180 days of the date of this memorandum.
"Produced in the United States" shall mean:
(i) With regard to iron or steel products, that all manufacturing processes for such iron or steel products, from the initial melting stage through the application of coatings, occurred in the United States.
(ii) Steel or iron material or products manufactured abroad from semi-finished steel or iron from the United States are not "produced in the United States" for purposes of this memorandum.
(iii) Steel or iron material or products manufactured in the United States from semi-finished steel or iron of foreign origin are not "produced in the United States" for purposes of this memorandum.
The Secretary of Commerce is hereby authorized and directed to publish this memorandum in the Federal Register.

DONALD J. TRUMP​


[/FONT]
 

Forum statistics

Threads
1,119,883
Messages
13,574,645
Members
100,879
Latest member
am_sports
The RX is the sports betting industry's leading information portal for bonuses, picks, and sportsbook reviews. Find the best deals offered by a sportsbook in your state and browse our free picks section.FacebookTwitterInstagramContact Usforum@therx.com