I filled in the worksheet, looks like most people have NO time available
Days that are absolutely out
8/10 Wedding
8/11 "
8/12 "
8/25 Cirque (this needs to be changed on the spreadsheet)
8/30 Sugerland
After that I'm flexible. I plan on doing some traveling after my daughter's wedding, but I can work around a draft date if we have one
PS: I think a few people need to expand their availability